|
Here
are some pictures of some recent moves that we have done.
|
U of A Barn Move |
|
 |
Pulling barn across field. Barns width is 42 feet, length is 124 feet. The barn was also 40 feet tall.
The barns weight was 162 ton with steel beams. |
 |
|
 |
1999 Kenworth with new planetary drive rear ends |
 |
|
 |
|
 |
|
 |
|
 |
Picker truck's 30 ton winch is assisting while backing over foundation |
 |
Foreman Doug Schmidt watching barn shift over for final alignment with new foundation |
 |
Ken Wedman and Doug Schmidt at U of A site |
House on River Near Edson |
|
 |
Driver Ken Wedman posing on top of house while over old foundation |
 |
House and garage seperated and ready to move |
 |
Pulling 67 foot wide, 80 foot long, and 90 ton house up road, away from river |
 |
On Highway 16 near Edson. Notice brick pillars and archway intact for entire move |
Hardisty Railway Station |
|
 |
Railway Station ready to be moved. 40 feet wide, 118 long, and just over 100 ton. |
 |
Removing top of brick chimney |
 |
Preping chimney for move. Chimney was moved intact for historical preservation |
 |
Setting station on dollies |
 |
Ready for move the next morning |
Cottage Move at Pigeon Lake |
|
 |
Leaving original cottage site. |
 |
|
 |
Backing towards the new foundation |
 |
Rolling over the new foundation |
 |
Removing beams with folding crane |
 |
Completed job on lakefront |
House move by Cold Lake |
|
 |
House move by Cold Lake, house was 42 feet wide by 70 feet long. |
 |
|
Bungalow move in Edmonton |
|
 |
Rolling house off of old foundation |
 |
Using crane to pull house |
 |
House rolled clear of retaining wall, 15 feet off of ground |
 |
Ready to lower house on to transport system |
Bon Accord Farm Move for Tom Kampas |
|
 |
Preparing for first lift, and removing roof over patio |
 |
First lift off of old foundation |
 |
House being moved with two 16-wheel dollies |
 |
House, barn, and shop all ready to be moved simultaneously |
 |
|
 |
|
 |
|
 |
Picker truck with shop tied to house to assist in downhill braking |
 |
|
 |
|
 |
32' by 86', and 96 ton brick house from Ellerslie. |
 |
Hinton Railway station historical relocation. |
 |
Pulling out with the Hinton Railway Station. |
 |
Moving a house at Griesbach army base. |
 |
Placing house on basement near Beaumont. |
 |
Supporting house for new foundation. |
 |
Brick house near downtown Edmonton raised and placed on new basement.
175 ton. |
 |
Placing brick house on a new basement. |
 |
Job completed. |
 |
Doug setting jacks. |
 |
Kenny running the unified jacking system. |
 |
Working at the Hinton Railway station. |
 |
Terryl running remote 35 ton picker. |
 |
Pulling out with two fertilizer sheds at Beaverlodge. |
 |
Raising the grain elevator. |
 |
Placing sliding beams under the grain elevator. |
 |
Winching grain elevator off of its foundation with two Kenworths. |
|
 |
Pulling off of the site. |
 |
New set of 16 wheel dollies in action. |
 |
On the road. |
 |
New 16 wheel oscillating dolly at work. |
|
 |
Pulling down a narrow road. |